Logistics

Next Project

Goresbrook, Dagenham, East London

Logistics

Goresbrook, Dagenham, East London

Logistics

Goresbrook, Dagenham, East London

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Next Project

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Logistics

Goresbrook, Dagenham, East London

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Next Project

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Logistics

Goresbrook, Dagenham, East London

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Next Project

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Logistics

Goresbrook, Dagenham, East London

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Next Project

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Logistics

Goresbrook, Dagenham, East London

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.

Next Project

This existing distribution park was appraised to see how its prominent location on the A13 in London could be maximized. The solution produced with the tenant Eddie Stobart required the demolition of two existing low eaves warehouses and the construction of a new high bay 180,000 square foot warehouse with an adjacent lorry park for over 130 lorries. Rail connectivity was preserved and a detailed construction phasing strategy was created so that demolition and construction did not interfere with the site’s day to day operations. The project was carried out on behalf of London Metric Plc.